All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Fiber optic elements with new standards for optical connectors for safety-intensive applications

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

    STA02023FW060

  • Main participants

    OPTOKON, a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    FW06010161 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Optické vláknové prvky s novými standardy optických konektorů pro bezpečnostně náročné aplikace

  • Annotation in Czech

    Cílem projektu je 5 závazných výsledků. Dva prototypy měřících pracovišť PRO1 (Realizace měřícího 8 kanálové pracoviště), PRO2 (Realizace měřícího 16 kanálové pracoviště), PRO3 (Prototyp optického kabelu), PRO4 (Ruční tester TEST-SET) a ověřená technologie výroby optického kabelu (OVT - Výroba optického kabelu). Výsledky PRO1 a PRO2 jsou podpůrné výsledky pro měření vlastností optických kabelů pro dosažení výsledku PRO3 a OVT. Hlavním cílem je výroba prototypu PRO3 a OVT, kde se jedná o nový typ optického kabelu určeného pro nové propojovací systémy určený pro použití v datových centrech. Unikátní vlastností optického kabelu spočívají v zcela ojedinělé minimalizaci rozměrů všech použitých součástí a z toho vyplývající maximální využití kapacity standardních datových rozvaděčů.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    10306 - Optics (including laser optics and quantum optics)

  • OECD FORD - secondary branch

    20203 - Telecommunications

  • OECD FORD - another secondary branch

    20202 - Communication engineering and systems

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    BH - Optics, masers and lasers<br>JW - Navigation, connection, detection and countermeasure

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The researchers, both during the project and in the final report, have documented the progress of the work and the results of the project in a relevant manner in accordance with the project proposal. The project outputs have been achieved and documented, while the real deployment and verification of the result in the data center application environment and the linking of the results to the foreign market have also been documented. The rapporteur proposes the project for award as excellent. The opposing committee agreed that the project succeeded with excellent results.

Solution timeline

  • Realization period - beginning

    Jan 1, 2023

  • Realization period - end

    Dec 31, 2025

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2025

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP26-TA0-FW-U

  • Data delivery date

    Jun 15, 2026

Finance

  • Total approved costs

    14,126 thou. CZK

  • Public financial support

    9,380 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,746 thou. CZK