All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of optical cables for use in special applications and in extreme conditions

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme for funding of applied research, experimental development, and innovation THETA

  • Call for proposals

    STA02023TK050

  • Main participants

    České vysoké učení technické v Praze / Fakulta elektrotechnická

  • Contest type

    VS - Public tender

  • Contract ID

    TK05020031 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Vývoj optických kabelů pro použití ve speciálních aplikacích a v extrémních podmínkách

  • Annotation in Czech

    Cílem projektu je realizace dvou prototypů optických kabelů (PRO1 a PRO2) a dvou ověřených technologií výroby pro tyto optické kabely (OVT1 a OVT2). Výsledkem projektu jsou zcela nové konstrukce optických kabelů, které v současnosti nemají na trhu optických kabelů ekvivalent. První konstrukce optického kabelu (PRO1) je určena pro perimetrickou ochranu, kde kabel bude sloužit k diagnostice pohybu osob v okolí kabelu. Druhý typ datového kabelu (PRO2) je určen pro použití v náročných prostředí, kde jedna z aplikací je použití v jaderných elektráren v lokalitách se zvýšenou radiací a zachování funkčnosti při havarijních stavech. Projekt umožní firmě OPTOKON Kable Co., s.r.o., rozšíření nabízených produktů a pracovišti ČVUT v Praze a ÚJV Řež, a. s. získání nových odborných znalostí.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    20305 - Nuclear related engineering; (nuclear physics to be 1.3);

  • OECD FORD - secondary branch

    10306 - Optics (including laser optics and quantum optics)

  • OECD FORD - another secondary branch

    20203 - Telecommunications

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    BH - Optics, masers and lasers<br>JF - Nuclear energy<br>JW - Navigation, connection, detection and countermeasure

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project was successfully completed in accordance with the original proposal and the grant agreement. No significant deviations from the project proposal occurred during implementation. The project met all planned mandatory deliverables (V2–V5), and the project team submitted all required documentation, including records of results achieved, test reports, implementation plans, and the accounting records of all participants. The project team demonstrated a high level of professional expertise commensurate with the complexity of the work. Based on the technical readiness achieved and ongoing negotiations, commercial application of the results is anticipated. While the project objectives were met, the results cannot be classified as groundbreaking or excellent; consequently, the project was not rated as having "succeeded with outstanding results."

Solution timeline

  • Realization period - beginning

    Feb 1, 2023

  • Realization period - end

    Dec 31, 2025

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2025

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP26-TA0-TK-U

  • Data delivery date

    Sep 15, 2026

Finance

  • Total approved costs

    17,896 thou. CZK

  • Public financial support

    10,635 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    7,261 thou. CZK