Stability analysis of cable stayed and suspension bridges
Project goals
Suspension and cable stayed bridges are frequent in civil engineering. Their advantages are the easy erection and economic efficiency. On the other hand they sometimes suffer form certain instabilities especially in wind. The main goal of this project isto formulate complex models of cable stayed and suspension bridges which describe vertical and torsion oscillations of the deck, oscillations of the pylons and behavior of the stressed cables. The analysis of these models makes possible to detect the sources of instabilities and eliminate or at least reduce these instabilities.
Keywords
cable stayed and suspension bridgecable systemmain cablestability analysis
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
Standardní projekty 11 (SGA02008GA-ST)
Main participants
—
Contest type
VS - Public tender
Contract ID
103/08/1700
Alternative language
Project name in Czech
Analýza stability zavěšených a visutých mostů
Annotation in Czech
Visuté a kabelové mosty se často objevují ve stavebním inženýrství. Jejich výhody jsou snadná konstrukce a ekonomická efektivnost. Na druhé straně trpí někdy určitými nestabilitami jsou-li vystaveny větru. Hlavním cílem tohoto projektu je navrhnout matematické modely kabelových a visutých mostů, které popisují torzní a vertikální kmity mostovky, kmity sloupů a předpětí kabelů. Budou analyzovány soustavy parciálních diferenciálních rovnic korespondující s těmito modely. Analýza těchto rovnic poslouží k odhalení zdrojů nestability a k navržení metod, jak tyto nestability eliminovat nebo alespoň redukovat.
Scientific branches
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The model describing the behavior of the main cables, which are attached to the vertical cables connected to the deck, was developed. The main cables, on which the deck rests, are fastened in the middle by bounds which prevent movement of the main cablesin the direction along the deck. In the case one band loosens, the whole system becomes strongly asymmetric, which may result in torsion oscil
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Dec 31, 2010
Project status
U - Finished project
Latest support payment
Apr 16, 2010
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP11-GA0-GA-U/03:3
Data delivery date
Feb 9, 2015
Finance
Total approved costs
888 thou. CZK
Public financial support
888 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Basic information
Recognised costs
888 CZK thou.
Public support
888 CZK thou.
100%
Provider
Czech Science Foundation
CEP
JM - Structural engineering
Solution period
01. 01. 2008 - 31. 12. 2010