Forward and inverse reliability-based optimization under uncertainties (FIRBO)
Project goals
The project is focused on robust efficient methods for reliability-based structural optimization under uncertainties. The attention is given on to the development of those methods which reduce the computational effort to an acceptable level. New novel methods and approaches are proposed: Double loop small-sample reliability-based optimization, inverse reliability-based optimization, artificial neural network-based response surface method and inverse response surface method.
Keywords
Optimizationreliabilityuncertaintiesinverse analysisartificial neural networkresponse surface methodLatin hypercube sampling
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
Standardní projekty 19 (SGA0201500001)
Main participants
Vysoké učení technické v Brně / Fakulta stavební
Contest type
VS - Public tender
Contract ID
15-07730S
Alternative language
Project name in Czech
Přímá a inverzní spolehlivostní optimalizace s ohledem na nejistoty (FIRBO)
Annotation in Czech
Projekt je zaměřen na robustní účinné metody pro spolehlivostní optimalizaci s ohledem na nejistoty. Pozornost je věnována rozvoji takových metod, které redukují výpočtové nároky na přijatelnou úroveň. Jsou navrženy nové původní metody a přístupy: Spolehlivostní optimalizace založená na malém počtu simulací typu „double loop“, inverzní spolehlivostní optimalizace, metoda plochy odezvy založená na umělých neuronových sítích a metoda inverzní plochy odezvy.
Scientific branches
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The project fulfilled the declared goals. Among the principal results are four journal papers of the type Jimp with a direct dedication to the project and one Jimp with a double dedication to GAČR projects. The results are particularly important in the field of optimization of numerical methods for solving reliability problems in structural engineering, including large construction systems.
Solution timeline
Realization period - beginning
Jan 1, 2015
Realization period - end
Apr 25, 2019
Project status
U - Finished project
Latest support payment
Apr 5, 2017
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP20-GA0-GA-U/01:1
Data delivery date
Jul 2, 2020
Finance
Total approved costs
3,297 thou. CZK
Public financial support
3,297 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Basic information
Recognised costs
3 297 CZK thou.
Public support
3 297 CZK thou.
100%
Provider
Czech Science Foundation
CEP
JM - Structural engineering
Solution period
01. 01. 2015 - 25. 04. 2019