All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Mechatronic structures with haevily distributed actuators and sensors

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 20 (SGA0201600001)

  • Main participants

    České vysoké učení technické v Praze / Fakulta strojní

  • Contest type

    VS - Public tender

  • Contract ID

    16-21961S

Alternative language

  • Project name in Czech

    Mechatronické struktury se silně distribuovanými aktuátory a senzory

  • Annotation in Czech

    Cílem projektu je výzkum a optimalizace mechatronických systémů vybavených pravidelnou hustou sítí mnoha senzorů a aktuátorů. Projekt bude mít dva hlavní výzkumné směry. Prvním směrem bude výzkum snadno laditelných a škálovatelných zákonů řízení definovaných omezeným počtem parametrů a optimalizovaných společně s lokálními mechanickými vlastnostmi kompaktní matrice senzorů a aktuátorů a pouze jednoduše laděných podle specifických globálních mechanických vlastností cílového produktu. Druhým směrem bude výzkum potlačování mnoha vlastních tvarů kmitání primární (funkční) struktury stroje pomocí konceptu mechatronické tuhosti realizovaného s použitím mnoha distribuovaných aktuátorů a senzorů. Bude postaven funkční model vybrané varianty vyvinuté mechatronické struktury s mnoha senzory a aktuátory. Řídící strategie a dynamické vlastnosti budou testovány na funkčním modelu.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JQ - Machinery and tools

  • CEP - secondary branch

    JR - Other machinery industry

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20301 - Mechanical engineering<br>20302 - Applied mechanics<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The possibilities of active vibration suppression of the structures equipped with a network of actuators and sensors were investigated. The improved advanced control strategies were designed and tested. The project objectives were fulfilled. The results were published in prestigious scientific journals and at international conferences. The funds were used in accordance with grant rules.

Solution timeline

  • Realization period - beginning

    Jan 1, 2016

  • Realization period - end

    Jul 22, 2020

  • Project status

    U - Finished project

  • Latest support payment

    Apr 26, 2018

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP21-GA0-GA-U/01:1

  • Data delivery date

    Apr 12, 2021

Finance

  • Total approved costs

    6,229 thou. CZK

  • Public financial support

    5,192 thou. CZK

  • Other public sources

    1,037 thou. CZK

  • Non public and foreign sources

    0 thou. CZK