All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

High-temperature stability of materials based on LC3 binders

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    SGA0202600001

  • Main participants

    Vysoké učení technické v Brně / Fakulta stavební

  • Contest type

    VS - Public tender

  • Contract ID

    26-20873S

Alternative language

  • Project name in Czech

    High-temperature stability of materials based on LC3 binders

  • Annotation in Czech

    Limestone calcined clay cement (LC3) is a novel type of building material that provides a significant reduction of CO2 emissions by replacing of Portland cement with supplementary cementitious materials with lower CO2 footprint. Recent research has primarily focused on the production process of LC3, the mineralogical and chemical composition, and the impact on the hydration process and mechanical properties. Since the crucial aspect of the application of any material is its durability, the main goal of the project is to investigate the influence of elevated temperatures on the performance of this type of cement which has been poorly studied so far. The project will provide a complex characterization of the microstructure and mechanical, fracture, thermal, and hygric properties of LC3 materials during and after the exposure to temperatures ranging from 200 to 1200 °C. Different cooling regimes will also be performed after high temperature exposure and their effect on the residual mechanical properties and microstructure will be analysed.

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    20101 - Civil engineering

  • OECD FORD - secondary branch

    20501 - Materials engineering

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JG - Metallurgy, metal materials<br>JN - Civil engineering<br>JP - Industrial processes and processing

Solution timeline

  • Realization period - beginning

    Jan 1, 2026

  • Realization period - end

    Dec 31, 2028

  • Project status

    Z - Beginning multi-year project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP26-GA0-GA-R

  • Data delivery date

    May 4, 2026

Finance

  • Total approved costs

    7,596 thou. CZK

  • Public financial support

    7,596 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK