High-temperature stability of materials based on LC3 binders
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
SGA0202600001
Main participants
Vysoké učení technické v Brně / Fakulta stavební
Contest type
VS - Public tender
Contract ID
26-20873S
Alternative language
Project name in Czech
High-temperature stability of materials based on LC3 binders
Annotation in Czech
Limestone calcined clay cement (LC3) is a novel type of building material that provides a significant reduction of CO2 emissions by replacing of Portland cement with supplementary cementitious materials with lower CO2 footprint. Recent research has primarily focused on the production process of LC3, the mineralogical and chemical composition, and the impact on the hydration process and mechanical properties. Since the crucial aspect of the application of any material is its durability, the main goal of the project is to investigate the influence of elevated temperatures on the performance of this type of cement which has been poorly studied so far. The project will provide a complex characterization of the microstructure and mechanical, fracture, thermal, and hygric properties of LC3 materials during and after the exposure to temperatures ranging from 200 to 1200 °C. Different cooling regimes will also be performed after high temperature exposure and their effect on the residual mechanical properties and microstructure will be analysed.
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
20101 - Civil engineering
OECD FORD - secondary branch
20501 - Materials engineering
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JG - Metallurgy, metal materials<br>JN - Civil engineering<br>JP - Industrial processes and processing
Solution timeline
Realization period - beginning
Jan 1, 2026
Realization period - end
Dec 31, 2028
Project status
Z - Beginning multi-year project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-GA0-GA-R
Data delivery date
May 4, 2026
Finance
Total approved costs
7,596 thou. CZK
Public financial support
7,596 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK