Transformer inrush current suppression
Project goals
The project's topics are methods of the transformer inrush current suppression concerning on transformers for a production technology and a safety separation transformers for a health service. The project is concerned on power transformers from one to tens of kVA. The aim is solution with the minimal start time and the inrush current suppression under level of the nominal transformer current. First step will be finishing of the one-phase soft-start uses the unknowing bipolar method of the transformer energization. The main task is devolution of the bipolar method for one-phase transformers to three-phase transformers. The uninformed bipolar method was discovered by proposer. The solution will be based on the computer model of the three-phase transformer containing the magnetic core hysteresis. The model will be used for the start sequence optimizing similarly as was done in the case of one-phase version. The project output will be publications and a functional prototype. The analysis of
Keywords
Public support
Provider
Czech Science Foundation
Programme
Post-graduate (doctorate) grants
Call for proposals
Postdoktorandské granty 8 (SGA02008GA1PD)
Main participants
—
Contest type
VS - Public tender
Contract ID
102/08/P453
Alternative language
Project name in Czech
Omezování zapínacího proudu transformátorů
Annotation in Czech
Obsahem projektu je řešení problémů způsobených zapínacím proudem transformátorů používaných ve výrobních technologiích a jako bezpečnostní oddělovací transformátory. Jde o výkonové transformátory od jednotek do desítek kVA. Cílem je nalezení řešení s minimální dobou rozběhu a omezením zapínacího proudu pod úroveň jmenovitého proudu transformátoru. Projekt je zaměřen na převod metody měkkého rozběhu s neinformovanou bipolární metodou připínání transformátoru, které je navrhovatel původcem, na připínánítřífázových transformátorů. K řešení bude vytvořen počítačový model třífázového transformátoru s hysterezí magnetického obvodu. S jeho použitím bude optimalizována rozběhová sekvence obdobně jak to bylo provedeno při návrhu jednofázové varianty. Výstupemprojektu by měl být, mimo publikací, funkční prototyp. Součástí projektu bude i studie možností použití informované metody připínání u malých výkonových transformátorů a metodika určování zapínacího proudu transformátorů v předvýrobní
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JA - Electronics and optoelectronics
CEP - secondary branch
JE - Non-nuclear power engineering, energy consumption and utilization
CEP - another secondary branch
BM - Solid-state physics and magnetism
10302 - Condensed matter physics (including formerly solid state physics, supercond.)
20201 - Electrical and electronic engineering
20704 - Energy and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The main objectives of the grant have been fulfilled and expected outcomes defined in the grant application, such as improvements in the transformer computer model with hysteresis, modification of non-informed transformer inrush current suppression method for three-phase machines, definition of methodology of estimating inrush current at preproduction stage and study of applicability of informed
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Dec 31, 2010
Project status
U - Finished project
Latest support payment
Apr 16, 2010
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP11-GA0-GP-U/04:3
Data delivery date
Mar 20, 2015
Finance
Total approved costs
522 thou. CZK
Public financial support
522 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Basic information
Recognised costs
522 CZK thou.
Public support
522 CZK thou.
100%
Provider
Czech Science Foundation
CEP
JA - Electronics and optoelectronics
Solution period
01. 01. 2008 - 31. 12. 2010