All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME08022

Structure stability of severely plastically deformed copper alloys

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 6 (SMSM2008ME3)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2783/2009-32

Alternative language

  • Project name in Czech

    Strukturní stabilita silně deformovaných slitin mědi

  • Annotation in Czech

    Cílem projektu je studovat a interpretovat procesy probíhající během velkých plastických deformací kvantitativním charakterizováním vývoje mikrostruktury, stability jemnoznné struktury a vlivu parametrů přípravy na zjemňování struktury binární slitiny Cu

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    "Ultrafine-grained Cu and CuZr polycrystals have been prepared by ECAP. The microstructure evolution and fine-grained structure stability have been studied by different experimental techniques. The results of the investigation were published in international journals (4 papers), presented in 3 international and 2 inland scientific conferences. All objectives of the project have been fulfilled. "

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Feb 24, 2009

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP10-MSM-ME-U/01:1

  • Data delivery date

    Jun 30, 2010

Finance

  • Total approved costs

    190 thou. CZK

  • Public financial support

    190 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK