All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME09011

Subduction Factory: Earthquake Production and Magma Emplacement

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 7 (SMSM2009ME4)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2060/2011-320

Alternative language

  • Project name in Czech

    Subdukční továrna: vznik zemětřesení a vmísťování magmatu

  • Annotation in Czech

    Přispět k porozumění procesům, které vedou k intenzivní zemětřesné činnosti v oblastech subdukce, řídí transport horninového materiálu mezi subdukční zónou a zemským povrchem a ovlivňují vlastnosti lávových dómů na povrchu.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DC - Seismology, volcanology and Earth structure

  • CEP - secondary branch

    DB - Geology and mineralogy

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10504 - Mineralogy<br>10505 - Geology<br>10506 - Paleontology<br>10507 - Volcanology

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The project contributed to the knowledge of magma migration and implacement, to interpretation of causes of irregular distribution of earthquakes (in Indonesia and in the area of the 2011 Tohoku earthquake) and to the establishment of the analog lab of the Institute of Geophysics. The results have bee published in 6 papers in journals with IF 5 manuscripts are either in print or in preparation.

Solution timeline

  • Realization period - beginning

    Apr 1, 2009

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 23, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-ME-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    2,072 thou. CZK

  • Public financial support

    2,072 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK