All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Mutational screening of primitive cell populations in chronic myeloid leukemia: BCR-ABL1 and beyond

Public support

  • Provider

    Ministry of Health

  • Programme

    Programme to support medical applied research in 2015 to 2022

  • Call for proposals

    Zdravotnický AV 3 (SMZ0201701)

  • Main participants

    Fakultní nemocnice Brno

  • Contest type

    VS - Public tender

  • Contract ID

    17-30397A

Alternative language

  • Project name in Czech

    Mutační analýza primitivních buněčných populací u chronické myeloidní leukémie: za hranicí BCR-ABL1

  • Annotation in Czech

    Chronická myeloidní leukémie (CML) je nádorové onemocnění charakterizované přítomností fúzního genu BCR-ABL1 a úspěšně léčena tyrozin kinázovými inhibitory (TKI). Selhání léčby může být zapříčiněno jednak faktory na straně pacienta (např. farmakokinetika), a jednak vlastnostmi nádorové buňky. Zde jsou hlavními příčinami mutace v kinázové doméně BCR-ABL1, způsobující rezistenci k TKI, nebo jiné mutace v genech mimo BCR-ABL1. Mutace v BCR-ABL1 genu i mimo BCR-ABL1 detekované v době diagnózy často mizí po zahájení TKI terapie a jejich klinický význam je proto nejasný. Příčinou může být fakt, že nevznikají v leukemických kmenových buňkách ale až ve vyzrálejších progenitorech, které jsou následkem TKI eliminované. Zatímco mutace v leukemických kmenových buňkách rezistentních na terapii mohou přetrvávat. Objasnění může přinést analýza mutací BCR-ABL1 a jiných genů v hierarchicky roztříděných populacích progenitorů a kmenových buněk v době diagnózy a na začátku terapie. Předpokládané výsledky objasní, zda mutace v kmenových buňkách mají větší předpoklad přežít TKI léčbu a vést k selhání.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    FD - Oncology and haematology

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    30204 - Oncology<br>30205 - Hematology

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    This is clinical research that has made it possible to analyze non-BCR-ABL1 mutations in progenitor cells using new molecular genetic techniques (NGS). Non-BCR-ABL1 mutations in progenitor cells in 9 patients were detected using a new biostatistic pipeline. Mutational status in non-BCR-ABL1 genes was correlated with overall survival (OS), progression-free survival (PFS), failure-free survival (FFS), incidence of adverse reactions, achieving major molecular remission (MMR) and complete cytogenetic remission (CCyR). Mutations in non-BCR-ABL1 genes were found in 9/49 (18%) patients analysed. However, no link was found between the mutational condition at the time of diagnosis and the survival of patients or response to treatment. However, this conclusion is limited by the low number of patients. The output of the project is 3 Jimp publications - the original article in a peer-reviewed professional periodical from the WoS database with the Article flag, but one is not directly related to th

Solution timeline

  • Realization period - beginning

    Apr 1, 2017

  • Realization period - end

    Dec 31, 2020

  • Project status

    U - Finished project

  • Latest support payment

    Jun 28, 2018

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP21-MZ0-NV-U/03:1

  • Data delivery date

    Jun 25, 2021

Finance

  • Total approved costs

    8,058 thou. CZK

  • Public financial support

    8,058 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK