All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The role of renin-angiotensin system in the pathophysiology of myocardial ischemia/reperfusion injury: preclinical study in animal models.

Public support

  • Provider

    Ministry of Health

  • Programme

    Programme to support medical applied research in 2015 to 2022

  • Call for proposals

    Zdravotnický AV 4 (SMZ0201800001)

  • Main participants

    Institut klinické a experimentální medicíny

  • Contest type

    VS - Public tender

  • Contract ID

    NV18-02-00014

Alternative language

  • Project name in Czech

    Úloha renin-angiotenzinového systému v patofyziologii srdečního ischemicko/reperfúzního poškození: preklinická studie na zvířecích modelech.

  • Annotation in Czech

    Systémová hypertenze a hypertrofie levé komory srdeční jsou obecně považovány za významné rizikové faktory, které zhoršují ischemickou odolnost myokardu. Naproti tomu přibývá důkazů, že hypertenze může také aktivovat mechanizmy, které přechodně chrání srdce před poškozením. Navrhovaný projekt je zaměřen na studium akutního ischemicko-reperfúzního poškození myokardu během rozvoje angiotenzin II-dependentní formy hypertenze u Cyp1a1-Ren-2 transgenních potkanů. Předpokládáme, že časná fáze hypertenze bude spojena s rezistentním srdečním fenotypem, zatímco nadměrná aktivace RAS v pozdějším stádiu hypertenze vyvolá zhoršení ischemického poškození. Zaměříme se především na odhalení signálních drah, které podmiňují zvýšenou odolnost myokardu a na analýzu dějů zodpovědných za ztrátu protektivního účinku s rozvojem maligní hypertenze. Výsledky by mohly sloužit jako podklad pro vývoj nových přístupů k prevenci a léčbě ischemických stavů a jejich přenos do praxe.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    30201 - Cardiac and Cardiovascular systems

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    FA - Cardiovascular diseases including cardio-surgery

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Project was contibuted to determine the degree of cardiac ischemic tolerance during the prehypertensive, early and late phase of ANG II-dependent form of hypertension, when signs of end-organ damage are already developed, and to to clarify the mechanism responsible for hypothesized increased cardiac ischemic tolerance in the initial phases of hypertension. The chosen research methods show the excellent orientation of the whole team not only in the issue of I/R cardiac injury in the experimental model, but also in all the necessary aspects of data analysis, organization and management of experimental research, which allowed to reach remarkable and valid conclusions. The findings could be used in the development of new therapeutic strategies against the negative effects of acute I/R injury. 2 papers in journals with IF and considering the complexity of the epidemiological situation caused by the COVID 19 pandemic are adequate outcomes. No major deficiencies have been identified.

Solution timeline

  • Realization period - beginning

    May 1, 2018

  • Realization period - end

    Dec 31, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Apr 26, 2021

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP23-MZ0-NV-U

  • Data delivery date

    Jun 22, 2023

Finance

  • Total approved costs

    8,736 thou. CZK

  • Public financial support

    8,683 thou. CZK

  • Other public sources

    53 thou. CZK

  • Non public and foreign sources

    0 thou. CZK