All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development of technologies for waste water purification from industrial activity and from old ecological loads with accent on removing of heavy metals and organic compounds.

Public support

  • Provider

    Ministry of Environment

  • Programme

    Environment and natural resources protection

  • Call for proposals

    Životní prostředí a ochrana přírodních zdrojů (TP1/DP4) 2 (SMZP2004SM003)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Výzkum a vývoj technologií pro oblast čištění toxických odpadních vod z průmyslové činnosti a ze starých ekologických zátěží s důrazem na odstraňování těžkých kovů a organických sloučenin.

  • Annotation in Czech

    Vývoj analyticko-toxikologických metod pro kontrolu sanačních prací. Výzkum a vývoj efektivních detoxikačních metod na odstraňování těžkých kovů a organických látek z kontaminovaných vod. Preferovány budou technol

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    DJ - Pollution and water control

  • CEP - secondary branch

    CI - Industrial chemistry and chemical engineering

  • CEP - another secondary branch

    CB - Analytical chemistry, separation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10406 - Analytical chemistry<br>10511 - Environmental sciences (social aspects to be 5.7)<br>20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The results of the project VaV MŽP SM 3/4/04 are in accordance with the submission and they have been reached by the way of the most modern scientifical and technical accesses

Solution timeline

  • Realization period - beginning

    Jan 1, 2004

  • Realization period - end

    Jan 1, 2006

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP07-MZP-SM-U/03:3

  • Data delivery date

    Apr 4, 2008

Finance

  • Total approved costs

    12,584 thou. CZK

  • Public financial support

    10,000 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,584 thou. CZK