All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Increase of safety during the charge and operation of electrically driven vehicles operating at a safe voltage level

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme for funding of applied research, experimental development, and innovation THETA

  • Call for proposals

    THETA 2 (STA02018TK020)

  • Main participants

    Aku Energy s.r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    TK02020173 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Zvýšení bezpečnosti při nabíjení a provozu elektricky poháněných vozidel provozovaných na bezpečné hladině napětí

  • Annotation in Czech

    Náš projekt je zaměřen na zlepšení bezpečnosti při provozu a nabíjení akumulátorových baterií pro pohon elektrických (převážně) jednostopých vozidel. Budeme se zabývat vývojem ochranných obvodů a nabíječů, zabezpečujících ideální podmínky pro provoz akumulátorů s ohledem na maximální bezpečnost uživatele . Reálná poptávka trhu v Evropě v posledních třech letech stoupla o 60%, proto si myslíme, že budoucí řešení má tržní potenciál. Cílem projektu je nabídnout komplexní řešení doplněné o komunikační prostředí tak, aby fungovalo jako jeden bezpečný a lehce kontrolovatelný celek.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    20704 - Energy and fuels

  • OECD FORD - secondary branch

    20201 - Electrical and electronic engineering

  • OECD FORD - another secondary branch

    20205 - Automation and control systems

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation<br>JD - Use of computers, robotics and its application<br>JE - Non-nuclear power engineering, energy consumption and utilization<br>JT - Propulsion, engines and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    On the basis of the high-quality achieved results of the solutions, which are documented in the professional documentation, as well as the achieved parameters, which were documented by measurements, I state that the project succeeded according to the assignment that was presented in the project proposal.

Solution timeline

  • Realization period - beginning

    Jul 1, 2019

  • Realization period - end

    Dec 31, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2022

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP23-TA0-TK-U

  • Data delivery date

    Jun 30, 2023

Finance

  • Total approved costs

    11,337 thou. CZK

  • Public financial support

    6,756 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,580 thou. CZK