Implementation of certification processes to ensure the integration of distributed power generating plants in compliance with the requirements of the EU Regulation
Project goals
The aim of the project is to identify applicability and in the form of a methodology to formulate methods and processes for power generating plants compliance verification with the connection network code requirements on the basis of certificates. Definition of conditionality, substitutability and validity of the certificates is an integral part of. Focus on the generating plants connected to medium and low voltage distribution systems is expected mainly. In parallel, necessary development and determination of supporting certified techniques for the compliance verification of components up to plants by testing under laboratory and operational conditions is the goal. These techniques provide a tool for the required physical verification, to which a compliance simulation is complementary.
Keywords
Power generating moduleGrid codeCompliance testingCertification
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme for funding of applied research, experimental development, and innovation THETA
Call for proposals
THÉTA 4 (STA02021TK040)
Main participants
Vysoké učení technické v Brně / Fakulta elektrotechniky a komunikačních technologií
Contest type
VS - Public tender
Contract ID
TK04010060 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Implementace certifikačních procesů pro zajištění integrace rozptýlených zdrojů v souladu s požadavky Nařízení EU
Annotation in Czech
Cílem projektu je identifikovat možnosti aplikace, analyzovat a v podobě metodiky zformulovat metody a procesy prokazování a udržování souladu výroben s požadavky na připojení na základě certifikátů. Nedílnou součástí je vymezení podmíněností, vazeb, zastupitelnosti a platnosti certifikátů. Zaměření je předpokládáno především na výrobny připojované do distribuční soustavy (DS) vysokého (vn) a nízkého napětí (nn). Současně je cílem nezbytný výzkum, vývoj a vymezení podpůrných certifikovaných metod a technik pro ověřování souladu komponent, výrobních jednotek a modulů a jejich monitoring testováním a měřením v laboratorních i provozních podmínkách. Tyto metody a techniky představují nástroj pro potřebné fyzické ověřování souladu, ke kterým je ověřování numerickou simulací komplementární.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20704 - Energy and fuels
OECD FORD - secondary branch
20201 - Electrical and electronic engineering
OECD FORD - another secondary branch
20205 - Automation and control systems
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JD - Use of computers, robotics and its application
JE - Non-nuclear power engineering, energy consumption and utilization
JT - Propulsion, engines and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
These are preliminary data, the Final Oponnent Panel hasn´t proceeded yet.
Solution timeline
Realization period - beginning
Jan 1, 2022
Realization period - end
Dec 31, 2023
Project status
U - Finished project
Latest support payment
Feb 28, 2023
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP24-TA0-TK-U
Data delivery date
Jun 28, 2024
Finance
Total approved costs
6,392 thou. CZK
Public financial support
5,476 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
916 thou. CZK
Recognised costs
6 392 CZK thou.
Public support
5 476 CZK thou.
0%
Provider
Technology Agency of the Czech Republic
OECD FORD
Energy and fuels
Solution period
01. 01. 2022 - 31. 12. 2023