Development of a 2nd generation Vdip fault localization system
Project goals
The project aims to develop the 2nd generation Vdip system (Vdip2) for the localization of asymmetric faults in medium voltage systems upgrading the Vdip system. Developed functionalities will extend the application of the localization system to high-impedance faults and faults where the auxiliary resistor is not connected. In contrast, the amount of transmitted data and time required for fault location evaluation is reduced. As part of the development, the system will be supplemented with PMU (synchronized phasor measurement unit) functionality integrated into distributed measurement units (DMU) and functionality enabling global voltage quality index evaluation. The development of DMU components is aimed at reducing acquisition costs while expanding DMU variability.
Keywords
fault locationmonitoring systemdistributed measurementearth faultdistribution system
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme for funding of applied research, experimental development, and innovation THETA
Call for proposals
THÉTA 4 (STA02021TK040)
Main participants
ELVAC a.s.
Contest type
VS - Public tender
Contract ID
TK04020187 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Vývoj systému pro lokalizaci poruch Vdip 2. generace
Annotation in Czech
Cílem projektu je vývoj systému Vdip 2. generace (Vdip2) pro lokalizaci nesymetrických poruch v soustavách vysokého napětí, který rozšiřuje systém Vdip. V rámci projektu budou vyvinuty funkcionality, které rozšíří oblast uplatnění systému lokalizace i na vysokoodporové poruchy a poruchy, kde nedochází k připínání pomocného odporníku, přičemž dojde k výraznému snížení nároků na přenášená data a čas potřebný k vyhodnocení místa poruchy. V rámci vývoje bude systém doplněn o funkcionalitu PMU (měření synchronních fázorů) integrovanou do distribuovaných měřících jednotek (DMU) a centrální monitoring kvality elektrické energie distribuční trafostanice, vývodu či napájecí rozvodny. Vývoj HW komponent DMU je cílen na snížení pořizovacích nákladů a rozšíření jejich variability.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20704 - Energy and fuels
OECD FORD - secondary branch
20201 - Electrical and electronic engineering
OECD FORD - another secondary branch
20202 - Communication engineering and systems
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JE - Non-nuclear power engineering, energy consumption and utilization
JT - Propulsion, engines and fuels
JW - Navigation, connection, detection and countermeasure
Solution timeline
Realization period - beginning
Jan 1, 2022
Realization period - end
Dec 31, 2024
Project status
K - Ending multi-year project
Latest support payment
Feb 28, 2023
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP24-TA0-TK-R
Data delivery date
Feb 20, 2024
Finance
Total approved costs
25,829 thou. CZK
Public financial support
15,456 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
10,373 thou. CZK
Basic information
Recognised costs
25 829 CZK thou.
Public support
15 456 CZK thou.
59%
Provider
Technology Agency of the Czech Republic
OECD FORD
Energy and fuels
Solution period
01. 01. 2022 - 31. 12. 2024