Power distribution cables with integrated cooling and heat distribution system for energy recovery
Project goals
The main objective of the project is the research and development of a hybrid (multifunctional) low voltage cable up to 1000 V for electric power distribution with an integrated cooling and heat distribution system for further thermal energy use. This means, for example, using the waste heat of the cable and at the same time the ground heat as a heat pump source. The optimal design of the hybrid cable will be solved and a functional sample of this cable will be made and verified within the project. The developed cable design will be protected by a utility model.
Keywords
hybrid cableelectric energy and heatenergy efficiencytechnology
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme for funding of applied research, experimental development, and innovation THETA
Call for proposals
STA02023TK050
Main participants
PRAKAB PRAŽSKÁ KABELOVNA, s.r.o.
Contest type
VS - Public tender
Contract ID
TK05020190 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Kabely pro rozvod elektrické energie s integrovaným systémem pro chlazení a rozvod tepla pro další energetické využití
Annotation in Czech
Hlavním cílem projektu je výzkum a vývoj hybridního (multifunkčního) kabelu nízkého napětí do 1000 V pro rozvod elektrické energie s integrovaným systémem pro chlazení a rozvod tepla pro další energetické využití. Tím se rozumí například využití ztrátového tepla kabelu a současně okolního zemního tepla jako zdroje tepelného čerpadla. V rámci projektu bude řešena optimální konstrukce hybridního kabelu a bude vyroben a ověřen funkční vzorek tohoto kabelu. Vyvinutá konstrukce kabelu bude chráněna užitným vzorem.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20704 - Energy and fuels
OECD FORD - secondary branch
20201 - Electrical and electronic engineering
OECD FORD - another secondary branch
20303 - Thermodynamics
BJ - Thermodynamics
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JE - Non-nuclear power engineering, energy consumption and utilization
JT - Propulsion, engines and fuels
Solution timeline
Realization period - beginning
Feb 1, 2023
Realization period - end
Dec 31, 2025
Project status
K - Ending multi-year project
Latest support payment
Feb 28, 2024
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP25-TA0-TK-R
Data delivery date
Feb 20, 2025
Finance
Total approved costs
10,223 thou. CZK
Public financial support
6,099 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
4,092 thou. CZK
Basic information
Recognised costs
10 223 CZK thou.
Public support
6 099 CZK thou.
59%
Provider
Technology Agency of the Czech Republic
OECD FORD
Energy and fuels
Solution period
01. 02. 2023 - 31. 12. 2025