All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development of progressive methods for determination of fire technical charcteristics (FTCH) of combustible/flammable substances and materials under specific technological conditions.

Public support

  • Provider

    Ministry of Interior

  • Programme

  • Call for proposals

  • Main participants

    Ministerstvo vnitra / Generální ředitelství HZS - Technický ústav požární ochrany

  • Contest type

    VZ - Public procurement

  • Contract ID

    MV-60767/P-2010

Alternative language

  • Project name in Czech

    Výzkum a vývoj progresivních metod stanovení požárně technických charakteristik (PTCH) hořlavých látek a materiálů za specifických technologických podmínek

  • Annotation in Czech

    Cílem řešení je vyvinout zkušební systém/y pro stanovení základních PTCH hořlavých látek a materiálů za specifických zkušebních podmínek simulujících technologické podmínky (tlak, teplotu, chemické složení prostředí) k objektivizaci řešení konkrétních problémů požární a protivýbuchové bezpečnosti vybraných technologií.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    AQ - Safety and health protection, safety in operating machinery

  • CEP - secondary branch

    CI - Industrial chemistry and chemical engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>30305 - Occupational health

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The targets set in the project proposal have been met. The main results of the project-Certified methodologies, Functional samples and Software-are of exceptional quality. The project also reported byproducts. All the results are directly linked to the objectives of the project and incurred during the project.

Solution timeline

  • Realization period - beginning

    Aug 1, 2011

  • Realization period - end

    Dec 31, 2015

  • Project status

    U - Finished project

  • Latest support payment

    Mar 23, 2015

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP16-MV0-VF-U/01:2

  • Data delivery date

    Jun 23, 2017

Finance

  • Total approved costs

    12,297 thou. CZK

  • Public financial support

    12,297 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK