All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Prevention of failures in energy plants by the risk based inspection methods with the connection of methods for diagnostic monitoring of the residual lifetime.

Public support

  • Provider

    Ministry of Interior

  • Programme

    Security Research for the Needs of the State 2010-2015

  • Call for proposals

    Program bezpečnostního výzkumu 3 (SMV02013BV003)

  • Main participants

    VÍTKOVICE ÚAM a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    MV-14543-5/OBVV-2013

Alternative language

  • Project name in Czech

    Zvýšení prevence proti závažným haváriím energetických celků pomocí metod inspekce a údržby založených na základě rizika ve spojení s metodami diagnostického sledování životnosti

  • Annotation in Czech

    Cíle projektu je vytvoření programového sytému, který bude sloužit provozovatelům energetických celků pro plánování a optimalizaci inspekcí provozovaných kritických zařízení. Programový systém bude založen na metodice RBI (Risk Based Inspection) a bude doplněn o metody diagnostického hodnocení poškozování konstrukcí. Algoritmy programového systému budou vytvořeny na základě metodik a scénářů poškozování konstrukčních uzlů v energetickém průmyslu.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JL - Fatigue and fracture mechanics

  • CEP - another secondary branch

    JR - Other machinery industry

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20301 - Mechanical engineering<br>20306 - Audio engineering, reliability analysis<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The targets set in the project proposal have been met. The main result of the project was achieved. The project also reported byproducts. All the results are directly linked to the objectives of the project and incurred during the project.

Solution timeline

  • Realization period - beginning

    Apr 1, 2013

  • Realization period - end

    Dec 31, 2015

  • Project status

    U - Finished project

  • Latest support payment

    Feb 27, 2015

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP16-MV0-VG-U/02:1

  • Data delivery date

    Mar 20, 2017

Finance

  • Total approved costs

    14,054 thou. CZK

  • Public financial support

    12,267 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,787 thou. CZK