All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Integrated Project Delivery Implementation Challenges in the Construction Industry

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216224%3A14560%2F19%3A00110900" target="_blank" >RIV/00216224:14560/19:00110900 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.civilejournal.org/index.php/cej/article/view/1490/pdf" target="_blank" >https://www.civilejournal.org/index.php/cej/article/view/1490/pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.28991/cej-2019-03091362" target="_blank" >10.28991/cej-2019-03091362</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Integrated Project Delivery Implementation Challenges in the Construction Industry

  • Original language description

    Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. 22 drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    50204 - Business and management

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2019

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Civil Engineering Journal

  • ISSN

    2476-3055

  • e-ISSN

  • Volume of the periodical

    5

  • Issue of the periodical within the volume

    8

  • Country of publishing house

    IR - IRAN, ISLAMIC REPUBLIC OF

  • Number of pages

    12

  • Pages from-to

    1672-1683

  • UT code for WoS article

    000484343900002

  • EID of the result in the Scopus database