All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Constructability obstacles: an exploratory factor analysis approach

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216224%3A14560%2F21%3A00129871" target="_blank" >RIV/00216224:14560/21:00129871 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.tandfonline.com/doi/abs/10.1080/15623599.2018.1534044?journalCode=tjcm20" target="_blank" >https://www.tandfonline.com/doi/abs/10.1080/15623599.2018.1534044?journalCode=tjcm20</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1080/15623599.2018.1534044" target="_blank" >10.1080/15623599.2018.1534044</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Constructability obstacles: an exploratory factor analysis approach

  • Original language description

    Constructability is a concept with relative and not absolute value to increase optimization capacity of resources such as workforce, time, cost, quality, and working environment conditions. Given the growing complexity of projects and the increased number of failed and abandoned projects, the necessity to implement constructability in projects has become more tangible. Although the effects of lack of quantitative definition of constructability role in the traditional construction approaches are evident and have led to lack of coordination in performance of construction projects, so far no comprehensive quantitative approach has been considered to analyze the obstacles to constructability implementation. This study aims to identify and categorize the obstacles to facilitating the presence of contractors in the early stages of planning and design to implement constructability. In this study a comprehensive list of obstacles to constructability implementation is developed as a questionnaire. This questionnaire was presented to the experts, active in the field of construction. Finally, its results were analyzed using exploratory factor analysis method. Totally, 63 obstacles were questioned, then they were categorized by some of the experts of this industry into five categories of macro factors, including contractual, environmental, managerial, technical, and organizational. The significance of this study is due to this fact that identifying and categorizing the key obstacles to constructability implementation provides a useful reference for managers and owners of the construction industry to identify and develop solutions to resolve them. Identifying the obstacles to the presence of contractors in the planning and design stage and having a quantitative view toward this issue affects project implementability. In this regard, one can present more effective solutions to facilitate the presence of contractors in the early stages of design and also improves the effectiveness of constructability.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    50204 - Business and management

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    International Journal of Construction Management

  • ISSN

    1562-3599

  • e-ISSN

    2331-2327

  • Volume of the periodical

    21

  • Issue of the periodical within the volume

    3

  • Country of publishing house

    GB - UNITED KINGDOM

  • Number of pages

    14

  • Pages from-to

    312-325

  • UT code for WoS article

    000618980400008

  • EID of the result in the Scopus database

    2-s2.0-85058095357