All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Risk and uncertainty assessment of natural disasters

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216275%3A25510%2F18%3A39913838" target="_blank" >RIV/00216275:25510/18:39913838 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.5593/sgem2018/5.2/S20.136" target="_blank" >http://dx.doi.org/10.5593/sgem2018/5.2/S20.136</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.5593/sgem2018/5.2/S20.136" target="_blank" >10.5593/sgem2018/5.2/S20.136</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Risk and uncertainty assessment of natural disasters

  • Original language description

    The concepts of danger, uncertainty and risk are often used intuitively and inaccurately not only in common language but also in the media where it is unfortunately commonplace and last but not least in scientific circles. The clan defines uncertainty, danger and risk, and graphically visualises the aspects it encompasses. The graph is defined by two dimensions, namely probability and objectivity. The notion of danger is the least unequivocal. This is an object property that is a threat. Uncertainty was mathematically defined by Heisenberg, the Nobel Prize winner of physics. It demonstrates the existence of conjugated pair of physical quantities. The greater the certainty of the magnitude of one quantity simultaneously means the greater the uncertainty for determining the second quantity of the conjugated pair. Risk as a concept relates to the process of risk assessment and risk management. The risk is most often confused with danger or danger. The risk always applies to a particular object, group of objects, system or group of systems. For the complex risk assessment, RM/RA CRAMM has been recommended to allow for a truly comprehensive risk assessment in the selected area or a selective assessment of environmental, technological or social risks. The advantage of the method is the quantitative characteristic of the input and output variables and the simple comparison and thus the uniqueness of the results and the flexibility of the application in the change of the input conditions.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2018

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM. Vol. 18. Issue 5.2

  • ISBN

  • ISSN

    1314-2704

  • e-ISSN

    1314-2704

  • Number of pages

    8

  • Pages from-to

    1057-1064

  • Publisher name

    SGEM

  • Place of publication

    Sofia

  • Event location

    Albena

  • Event date

    Jul 2, 2018

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article