Deterministic And Probabilistic Design Of Concrete Structures - Environmental Aspects
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F13%3APU106516" target="_blank" >RIV/00216305:26110/13:PU106516 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Deterministic And Probabilistic Design Of Concrete Structures - Environmental Aspects
Original language description
This contribution describes a comparison of the concrete structure design results obtained via the partial reliability factor method and using the fully probabilistic method. The Monte Carlo simulation method, modified by the Latin Hypercube Sampling (LHS) method, was used for the calculation of the reliability of a designed structure. Economic and ecological aspects were taken into account when assessing the quality of the design.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
Result was created during the realization of more than one project. More information in the Projects tab.
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2013
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
First International Conference on Concrete Sustainability, ICCS13
ISBN
978-4-86384-041-6
ISSN
—
e-ISSN
—
Number of pages
6
Pages from-to
637-642
Publisher name
Japan Concrete Institute
Place of publication
Tokyo
Event location
Tokyo
Event date
May 27, 2013
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—