Performance of centralised trigeneration plant on sensitivity analysis of total site system
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F20%3APU138706" target="_blank" >RIV/00216305:26210/20:PU138706 - isvavai.cz</a>
Result on the web
<a href="https://iopscience.iop.org/article/10.1088/1757-899X/991/1/012141" target="_blank" >https://iopscience.iop.org/article/10.1088/1757-899X/991/1/012141</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1757-899X/991/1/012141" target="_blank" >10.1088/1757-899X/991/1/012141</a>
Alternative languages
Result language
angličtina
Original language name
Performance of centralised trigeneration plant on sensitivity analysis of total site system
Original language description
The progressive rising of high living standards and populations’ growth has led to increasing energy demands. This has led to the energy shortage gap in both developing and developed countries. Government is developing new technology to increase the thermal efficiency of existing power systems. Trigeneration is one of the innovations that can increase the performance of power systems by reusing waste energy for heating and cooling applications. Pinch Analysis (PA) is a methodology that has been commonly applied for more than 40 years to design and optimum configurations of various resource networks. Previous studies have been performed optimisation of trigeneration system in a Total Site system based on the PA method called Trigeneration System Cascade Analysis (TriGenSCA). However, the previous study does not consider the performance of the trigeneration system through overall sensitivity analysis of Total Site system. Overall sensitivity analysis of the Total Site system that includes industrial plant's maintenance shutdown and production changes affected the performance of the centralized trigeneration system to generate energy to be supplied to the demands. Through this analysis, the size of the trigeneration system and back-up system can be estimated taking into consideration data fluctuations probability. The methodology has been tested on the centralized nuclear trigeneration system in a Total Site system considering four industrial plants as a case study, leading to extra 3.1 MW of Low-Pressure Steam (LPS) and 7.15 MW of Hot Water (HW) are needed from the back-up system if Plant B is shut down as well as extra of 82.4 MW of HW is needed by the back-up system if Plant C is shut down. The size of the boiler and condensate system, hence, need to be improved to overcome the deficit energy as the Plants B and C are shut down. © 2020 Institute of Physics Publishing. All rights reserved.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20704 - Energy and fuels
Result continuities
Project
<a href="/en/project/EF15_003%2F0000456" target="_blank" >EF15_003/0000456: Sustainable Process Integration Laboratory (SPIL)</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2020
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
IOP Conference Series: Materials Science and Engineering
ISBN
—
ISSN
1757-8981
e-ISSN
—
Number of pages
13
Pages from-to
012141-012141
Publisher name
IOP Publishing Ltd
Place of publication
neuveden
Event location
Kuala Lumpur
Event date
Aug 9, 2020
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
000659997200141