All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Comparison of Deterministic Approach and Monte Carlo Methods for Stochastic PERT Chart

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26510%2F14%3APU109911" target="_blank" >RIV/00216305:26510/14:PU109911 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Comparison of Deterministic Approach and Monte Carlo Methods for Stochastic PERT Chart

  • Original language description

    The paper deals with a comparison of two different approaches (deterministic approach and Monte Carlo method) calculation of the probability of completion of the project. The base assumption of authors can be expressed: The difference between the resultsobtained by the Monte Carlo method and deterministic approach is not significant with increasing number of simulations (iterations). For this reason the hypothesis was formulated: There is no statistically significant difference between the calculated probabilities, i.e. both approaches are identical from application point of view. The problem was solved using the example project whose model (network chart) contained 18 nodes and 24 activities (18 real. 6 fictions). For each activity have been known three time estimates (pessimistic, most likely, optimistic). The planned date of completion of the project was selected at 200 time units and it was calculated the probability of completion of the project by deterministic approach and Monte

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    AE - Management, administration and clerical work

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2014

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Vision 2020: Sustainable Growth, Economic Development, and Global Competitiveness

  • ISBN

    978-0-9860419-2-1

  • ISSN

  • e-ISSN

  • Number of pages

    7

  • Pages from-to

    1923-1929

  • Publisher name

    International Business Information Management Association (IBIMA)

  • Place of publication

    Valencia, Spain

  • Event location

    Valencia

  • Event date

    May 13, 2014

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000339308100197