Report on Task 0
Original language description
The scope of the document is to summarize the preparatory phase for the testing of the LTCC sensors. The subtask 0 was defined as following: The Supplier shall plan the irradiation test in-line with the specifications as and taking into account the F4E technical inputs as specified in section 3.2 of the present Task Order. The Supplier shall address the following high level preparation plans using the template and report on date in-line with delivery of deliverable 1: a) A schedule plan in the form of a Gantt chart showing, at a minimum, the following project phases: Preparation, Design, Commissioning, Irradiation and PIE (option). The Schedule shall contain key Hold Points and Milestones (e.g. license to irradiate the experiment, reactor start date, delivery need date for DUT for installation on irradiation basket). b) An irradiation test plan.
Czech name
—
Czech description
—
Classification
Type
V<sub>souhrn</sub> - Summary research report
CEP classification
JF - Nuclear energy
OECD FORD branch
—
Result continuities
Project
—
Continuities
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Others
Publication year
2015
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Number of pages
12
Place of publication
Řež
Publisher/client name
—
Version
—