All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Application of TDABC Systems and Their Support with ABMS Approach

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F47813059%3A19520%2F23%3AA0000387" target="_blank" >RIV/47813059:19520/23:A0000387 - isvavai.cz</a>

  • Result on the web

    <a href="https://link.springer.com/chapter/10.1007/978-981-99-3068-5_10" target="_blank" >https://link.springer.com/chapter/10.1007/978-981-99-3068-5_10</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1007/978-981-99-3068-5_10" target="_blank" >10.1007/978-981-99-3068-5_10</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Application of TDABC Systems and Their Support with ABMS Approach

  • Original language description

    Business process simulations (BPS) are considered a relevant and highly appli-cable method of analysis. BPS allow analysis of business processes under dif-ferent conditions. There are several approaches towards simulation of business processes such as discrete event simulations (DES), agent-based modelling and simulation (ABMS) or system dynamics (SD). This research focuses on ABMS approach towards simulation of business processes and its importance for sim-ulation of costs using time-driven activity-based costing (TDABC). Using ABMS approach, active elements of the system are represented by software agents which are programmed to follow some behavioral rules and autono-mously interact with each other. This is especially important for TADBC ap-proach to simulation of costs as simulation of resources has a direct impact on activity durations which drives the costs in TDABC approach. We present a case study, where is shown, how important is a process flow and organizational perspective for simulation of process costs using TDABC approach. The re-quired detail of business process simulation can be achieved through the use of ABMS approach. After that, we discuss other shortcomings of traditional busi-ness process simulation techniques which might have a significant impact on allocation of costs using TDABC and its simulations.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Smart Innovation, Systems and Technologies

  • ISBN

  • ISSN

    2190-3018

  • e-ISSN

  • Number of pages

    10

  • Pages from-to

    109-118

  • Publisher name

    Springer

  • Place of publication

    Singapore

  • Event location

    Rome, Italy

  • Event date

    Jun 14, 2023

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article