All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Simulation of two cases steam turbine with synchronous generator during the switching into its self-consumption supply

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F15%3A43926220" target="_blank" >RIV/49777513:23220/15:43926220 - isvavai.cz</a>

  • Result on the web

    <a href="http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7165357" target="_blank" >http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7165357</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/EEEIC.2015.7165357" target="_blank" >10.1109/EEEIC.2015.7165357</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Simulation of two cases steam turbine with synchronous generator during the switching into its self-consumption supply

  • Original language description

    This paper describes control of two cases steam turbine with synchronous generator which is switched into its self-consumption supply. The frequency in an electrical grid is stated on nominal value which is in the Union for the Coordination of the Transmission of Electricity (UCTE) grid 50 Hz. When deviation of the frequency is higher than 0.2 Hz, the switching of particular steam units into the island operation is only the chance how to maintain the supply of, at least, some small grids. The other possibility how to keep power units in operation, to be prepared for the next synchronization to the grid, is to switch them to operation status in which they supply only their self-consumption. This change of the operating state is the most dynamic load change for the control system of the unit. Simulation of switching of the urbogenerator into its selfconsumption is examined in MATLAB Simulink software.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JE - Non-nuclear power engineering, energy consumption and utilization

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2015

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    2015 IEEE 15th International Conference on Environment and Electrical Engineering, EEEIC 2015 - Conference Proceedings

  • ISBN

    978-1-4799-7993-6

  • ISSN

  • e-ISSN

  • Number of pages

    4

  • Pages from-to

    1298-1301

  • Publisher name

    IEEE

  • Place of publication

    Piscataway

  • Event location

    Řím, Itálie

  • Event date

    Jun 10, 2015

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article