All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Blackout Exercise Preparation and Organization by Crisis Management Authorities

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60162694%3AG42__%2F17%3A00534507" target="_blank" >RIV/60162694:G42__/17:00534507 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Blackout Exercise Preparation and Organization by Crisis Management Authorities

  • Original language description

    The article presents an approach to the preparation of a selected part of the documentation of the crisis management authorities of both the region and municipalities with extended powers staff exercise in the South Bohemian Region, Czech Republic. The topic of the exercise was a simulated crisis situation - a long-term power outage (Blackout 2017 exercise) which represents an unacceptable risk for the regional area. In accordance with the timetable, exercise preparation was divided into activities that followed one another. Main tasks of the exercise preparation fell within the competence of the managing and working groups and crisis management staff of municipalities with extended powers. Results from the preparatory phase of the crisis management exercise show that a thorough and responsible territory analysis based on the time-consuming collection of input data and their evaluation is required. During the preparatory phase, a low number of operators connected to the back-up power sources as well as high requirements on their provision and fuel supply for their operation have been identified. Problems in connection provision (information exchange), complicated defining of functionality priorities and others have been found out. The total duration of the Blackout 2017 exercise preparatory phase was 11 months. The interconnectedness of individual activities was compiled using a Gantt chart. During this period, it was indispensable for the responsible staff to meet the set deadlines in due time according to the exercise preparation timetable.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    50902 - Social sciences, interdisciplinary

Result continuities

  • Project

    <a href="/en/project/TA04021582" target="_blank" >TA04021582: Research and Development of Simulation Instruments for Interoperability Training of Crisis Management Participants and Subjects of Critical Infrastructure.</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    3rd International Conference on Lifelong Learning and Leadership for All

  • ISBN

    978-605-66495-2-3

  • ISSN

  • e-ISSN

  • Number of pages

    9

  • Pages from-to

    687-695

  • Publisher name

    SAKARYA UNIV FAC EDUC, SAKARYA, 54300, TURKEY

  • Place of publication

    Porto

  • Event location

    Porto

  • Event date

    Sep 12, 2017

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000464901900083