All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Improvements for the Planning Process in the Scrum Method

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41110%2F24%3A100812" target="_blank" >RIV/60460709:41110/24:100812 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.mdpi.com/2076-3417/15/1/202" target="_blank" >https://www.mdpi.com/2076-3417/15/1/202</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3390/app15010202" target="_blank" >10.3390/app15010202</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Improvements for the Planning Process in the Scrum Method

  • Original language description

    In today’s dynamic development environments, agile methodologies like Scrum are essential for effective software project management. Despite its popularity, the Scrum framework’s reliance on subjective intuition during the sprint planning process can lead to inconsistencies and project delays. This study aims to enhance the sprint planning phase by integrating the BeCoMe method, which is a mathematical approach designed to optimize task selection through structured compromise solutions. Utilizing a soft systems methodology, this research identifies and analyzes the existing inefficiencies in Scrum’s planning process. The implementation of the BeCoMe method in a real-world case study demonstrated significant improvements in task completion rates and overall project efficiency. The method’s structured process reduces biases, fosters team consensus, and enhances decision-making accuracy. The findings suggest that incorporating the BeCoMe method into Scrum can substantially mitigate risks, save time, and improve project outcomes by ensuring a more objective and data-driven approach to sprint planning. These insights are crucial for developers managing modern software projects, offering a robust framework for enhancing planning efficiency and success rates.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    21100 - Other engineering and technologies

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2024

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Applied Sciences-BASEL

  • ISSN

    2076-3417

  • e-ISSN

    2076-3417

  • Volume of the periodical

    15

  • Issue of the periodical within the volume

    1

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    20

  • Pages from-to

    1-20

  • UT code for WoS article

    001393457500001

  • EID of the result in the Scopus database