All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

RELIABILITY ASSESSMENT OF THE PRETENSIONED BOLTS BASED ON PROBABILITY

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27230%2F17%3A10236138" target="_blank" >RIV/61989100:27230/17:10236138 - isvavai.cz</a>

  • Result on the web

    <a href="https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=1&SID=P2sV3NN5S4YYFolkgi6&page=1&doc=5" target="_blank" >https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=1&SID=P2sV3NN5S4YYFolkgi6&page=1&doc=5</a>

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    RELIABILITY ASSESSMENT OF THE PRETENSIONED BOLTS BASED ON PROBABILITY

  • Original language description

    The experience indicates that the most common reason of the construction or assembly incoherency are not really irregular outside loads or influences but unpredictable standard behaviour of the bolted joints. Incorrect application or design of the bolted joints can lead to catastrophic accidents. The most common mistakes are under-sizing or inappropriate over-sizing, ignoring the fatigue, creep or anticorrosion protection. Bolted joints are in their working conditions exposed to action of internal or external forces with a different magnitudes and orientations. Presented article should provide a basic guide how to set certain loads acting on the bolted joint and calculate the reliability of the bolted joint considering the probabilistic approaches. In order to capture random variables in design and validation stage of the bolted joints, Simulation Based Reliability Assessment (SBRA) using Monte Carlo method is presented

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20301 - Mechanical engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Engineering Mechanics 2017: 23rd international conference : May 15-18, 2017, Svratka, Czech Republic : book of full texts

  • ISBN

    978-80-214-5497-2

  • ISSN

  • e-ISSN

    neuvedeno

  • Number of pages

    4

  • Pages from-to

    626-629

  • Publisher name

    Brno University of Technology

  • Place of publication

    Brno

  • Event location

    Svratka

  • Event date

    May 15, 2017

  • Type of event by nationality

    EUR - Evropská akce

  • UT code for WoS article