All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Engineering-geological study of relationships between soil and rock workability, type and volume of excavated materials, and earthwork costs (six case studies)

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F23%3A10252380" target="_blank" >RIV/61989100:27350/23:10252380 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.webofscience.com/wos/woscc/full-record/WOS:000962406600002" target="_blank" >https://www.webofscience.com/wos/woscc/full-record/WOS:000962406600002</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1038/s41598-023-31859-3" target="_blank" >10.1038/s41598-023-31859-3</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Engineering-geological study of relationships between soil and rock workability, type and volume of excavated materials, and earthwork costs (six case studies)

  • Original language description

    The engineering-geological study deals with the study of significance and relationship of soil and rock workability (factor representing the engineering-geological structure of rock massif) and the remaining earthwork parameters influencing the cost of construction work, such as excavation type and its technology, and excavated cubic volume. The comparative tool was the cost of earthwork as it reflects the real value of the given parameters during the implementation of earthwork. Soil and rock workability is the most important parameter of rock massif engineering-geological structure during any earthwork. The investor pays the contractor for earthwork based on workability classes which have their accounting value expressed as a volume unit of earthwork per particular project. The research results arise from a comparison of 6 sewer system construction project case studies in the north-east of the Czech Republic. The research shows that the most important factor during the implementation of earthwork is the specific engineering-geological structure (52%), which reflects in the parameter of soil and rock workability classes, using which all earthwork is priced. The second most important factor (33%) is the type of excavation and its technology. The least important is the excavated cubic volume (15%), which means the overall cubic volume of earthwork. The results were obtained within three evaluation approaches, where the comparison unit was one cubic meter of excavated volume during earthwork.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Scientific Reports

  • ISSN

    2045-2322

  • e-ISSN

  • Volume of the periodical

    13

  • Issue of the periodical within the volume

    1

  • Country of publishing house

    US - UNITED STATES

  • Number of pages

    16

  • Pages from-to

  • UT code for WoS article

    000962406600002

  • EID of the result in the Scopus database

    2-s2.0-85151330443