Control of costs in foundries - costing demands in production
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27360%2F02%3A00006903" target="_blank" >RIV/61989100:27360/02:00006903 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Control of costs in foundries - costing demands in production
Original language description
This contribution presents a concise description and the present-day state of solution of the fundamental issue of the Czech foundries i.e. implementation of consecutive control of costs. This article deals simultaneously with the full-scale experience with possible ways of utilization and introduction of the method of operative costing in the individual production stages. Under conditions of foundry of the NOVA HUŤ, a.s. Ostrava some 3 castings were selected to verify the methology of cast drawing.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JG - Metallurgy, metal materials
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/GA106%2F01%2F1385" target="_blank" >GA106/01/1385: Development of cost monitoring system in foundries by means of cost models</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2002
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
In: Tagungsband. 9. Studententag des Hüttenwesens
ISBN
3-86012-171-5
ISSN
—
e-ISSN
—
Number of pages
5
Pages from-to
38-42
Publisher name
Interessengemeinschaft Studententag des Hüttenwesens in Freiberg
Place of publication
Freiberg
Event location
Freiberg
Event date
Apr 4, 2002
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—