GREGOR solar telescope: Design and status
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F67985815%3A_____%2F10%3A00355356" target="_blank" >RIV/67985815:_____/10:00355356 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
GREGOR solar telescope: Design and status
Original language description
The integration and verification phase of the GREGOR telescope reached an important milestone with the installation of the interim 1 m SolarLite primary mirror. This was the first time that the entire light path had seen sunlight. Since then extensive testing of the telescope and its subsystems has been carried out. The integration and verification phase will culminate with the delivery and installation of the final 1.5 m Zerodur primary mirror in the summer of 2010.
Czech name
—
Czech description
—
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
BN - Astronomy and celestial mechanics, astrophysics
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2010
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Astronomische Nachrichten
ISSN
0004-6337
e-ISSN
—
Volume of the periodical
331
Issue of the periodical within the volume
6
Country of publishing house
DE - GERMANY
Number of pages
4
Pages from-to
—
UT code for WoS article
000279751300019
EID of the result in the Scopus database
—