GREGOR telescope: start of commissioning
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F67985815%3A_____%2F10%3A00374021" target="_blank" >RIV/67985815:_____/10:00374021 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
GREGOR telescope: start of commissioning
Original language description
With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
BN - Astronomy and celestial mechanics, astrophysics
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2010
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Ground-based and Airborne Telescopes III
ISBN
9780819482235
ISSN
—
e-ISSN
—
Number of pages
9
Pages from-to
"77330K"-"1-77330K-9"
Publisher name
SPIE
Place of publication
Bellingham
Event location
San Diego
Event date
Jun 27, 2010
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
000285506700018