All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Control of rockburst risk in hard coal longwall mining ? A case study

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68145535%3A_____%2F13%3A00396835" target="_blank" >RIV/68145535:_____/13:00396835 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Control of rockburst risk in hard coal longwall mining ? A case study

  • Original language description

    Rockburst represents a very dangerous phenomenon in the Upper Silesian Coal Basin (USCB). The rockburst problem relates to the natural and mining conditions in the rock mass. It is very difficult to decide which of the factors prevails, but we generallyassume that the existence of competent adjacent rocks in the roof of the seams and incomplete seam extraction in the overburden, cause irregular stress distribution in the rock mass and stress overflow in those regions with the highest stress concentration. Destress blasting in overlying competent rocks is a very important rockburst control technique.The case study describes the control of rockburst risk by destress blasting in an example of the longwall of the Czech part of the USCB. Destress blasting,in the competent overburden of the exploited seam, was applied as the main rockburst prevention method. Groups of boreholes were fired ahead of the longwall face with explosive charges of up to 4500 kg during the longwall mining of the t

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    DH - Mining industry including coal mining and processing

  • OECD FORD branch

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2013

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    EUROCK 2013 - Rock Mechanics for Resources, Energy and Environment

  • ISBN

    978-1-138-00080-3

  • ISSN

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

    745-750

  • Publisher name

    CRC Press Taylor & Francis Group, Balkema

  • Place of publication

    London

  • Event location

    Wroclaw

  • Event date

    Sep 23, 2013

  • Type of event by nationality

    EUR - Evropská akce

  • UT code for WoS article