All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

REDUCTION OF THE RISK IN PUBLIC PROCUREMENT BY USING DESIGN-BUILD AS A MEANS FOR SUITABLE CONSTRUCTING

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00300551" target="_blank" >RIV/68407700:21110/16:00300551 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.civilengineeringjournal.cz/archive/issues/2016/2016_2/2-2016-0007_Blatak_final.pdf" target="_blank" >http://www.civilengineeringjournal.cz/archive/issues/2016/2016_2/2-2016-0007_Blatak_final.pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.14311/CEJ.2016.02.0007" target="_blank" >10.14311/CEJ.2016.02.0007</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    REDUCTION OF THE RISK IN PUBLIC PROCUREMENT BY USING DESIGN-BUILD AS A MEANS FOR SUITABLE CONSTRUCTING

  • Original language description

    Suitable and sustainable buildings have increased demands for design and for the transfer of design requirements to realization. That causes an increase of risk connected with the differences between planned and real parameters of the buildings. This article will outline the main theme comparison between DBB and DB projects concerning contractor’s risk management level. This comparative analysis explains, using the RIPRAN method, the hidden risks in each type of delivery method. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types. The results indicate risk factors with influence on the price, probability of occurrence and unfavourable impact on the project and help allocate risk level more properly in accordance with its high, middle or low probable impact. Public investment is a significant part of the public budget, the application of design-build can help with the reduction of corruption, and the public sector can benefit from the usage of DB projects to help eliminate the mistakes made by contracting authorities.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Stavební obzor

  • ISSN

    1210-4027

  • e-ISSN

  • Volume of the periodical

    2016

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    CZ - CZECH REPUBLIC

  • Number of pages

    9

  • Pages from-to

  • UT code for WoS article

  • EID of the result in the Scopus database