Potential of Using Design-Build in Public Procurement
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00300552" target="_blank" >RIV/68407700:21110/16:00300552 - isvavai.cz</a>
Result on the web
<a href="http://redfame.com/journal/index.php/afa/article/view/1708/1763" target="_blank" >http://redfame.com/journal/index.php/afa/article/view/1708/1763</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.11114/afa.v2i2.1708" target="_blank" >10.11114/afa.v2i2.1708</a>
Alternative languages
Result language
angličtina
Original language name
Potential of Using Design-Build in Public Procurement
Original language description
Risk is an omnipresent effect in every area of human activity. Ignoring it can cause serious problems. This article is about eliminating risk in public contracts using the design-build method as a possible solution to reduce risk. First, we need to compare the standard method of design-bid-build with its alternative, design-build. Two methods are used in this article to analyse risk – the main method is RIPRAN. The evaluated results provided by the RIPRAN method are processed by research data using a scoring method with a risk map. The analysis is going to detect the difference between the DBB and DB methods, primarily in appearance and its impact on the realization of the whole construction. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the most suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types.
Czech name
—
Czech description
—
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Others
Publication year
2016
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Applied Finance and Accounting
ISSN
2374-2410
e-ISSN
—
Volume of the periodical
2
Issue of the periodical within the volume
2
Country of publishing house
US - UNITED STATES
Number of pages
9
Pages from-to
77-85
UT code for WoS article
—
EID of the result in the Scopus database
—