All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Potential of Using Design-Build in Public Procurement

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00300552" target="_blank" >RIV/68407700:21110/16:00300552 - isvavai.cz</a>

  • Result on the web

    <a href="http://redfame.com/journal/index.php/afa/article/view/1708/1763" target="_blank" >http://redfame.com/journal/index.php/afa/article/view/1708/1763</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.11114/afa.v2i2.1708" target="_blank" >10.11114/afa.v2i2.1708</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Potential of Using Design-Build in Public Procurement

  • Original language description

    Risk is an omnipresent effect in every area of human activity. Ignoring it can cause serious problems. This article is about eliminating risk in public contracts using the design-build method as a possible solution to reduce risk. First, we need to compare the standard method of design-bid-build with its alternative, design-build. Two methods are used in this article to analyse risk – the main method is RIPRAN. The evaluated results provided by the RIPRAN method are processed by research data using a scoring method with a risk map. The analysis is going to detect the difference between the DBB and DB methods, primarily in appearance and its impact on the realization of the whole construction. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the most suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Applied Finance and Accounting

  • ISSN

    2374-2410

  • e-ISSN

  • Volume of the periodical

    2

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    US - UNITED STATES

  • Number of pages

    9

  • Pages from-to

    77-85

  • UT code for WoS article

  • EID of the result in the Scopus database