All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The behaviour of the bridges with the MW steering bar

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00301893" target="_blank" >RIV/68407700:21110/16:00301893 - isvavai.cz</a>

  • Result on the web

    <a href="https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=OneClickSearch&qid=14&SID=V2GoTciOldzlD3B3noh&page=1&doc=1" target="_blank" >https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=OneClickSearch&qid=14&SID=V2GoTciOldzlD3B3noh&page=1&doc=1</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.proeng.2016.08.313" target="_blank" >10.1016/j.proeng.2016.08.313</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    The behaviour of the bridges with the MW steering bar

  • Original language description

    The track-bridge interaction is a widely discussed and important topic today, as the modern railway bridges commonly exceed the maximum dilatation lengths allowed for the continuous welded rail. In this case, the Meyer-Wunstorf steering bar is one of the suitable solutions that can move the fixed point of the bridge to the middle of the span and thus exceed the possibility of the application of the continuous welded rail without any rail expansion devices. However, this solution is new in the Czech Republic and its functionality and durability should be verified. The paper deals with the extensive load tests, made on the first Czech railway bridge with the steering bar Meyer-Wunstorf. The two-track railway arch bridge on the Tábor - Sudoměřice track crosses the D3 highway with the span of 100 m. The load tests were focused on the horizontal brake and acceleration forces with the heavy train (totally 1056 t) and four locomotives of weight 318,6 t. During the test, a number of values were measured, such as stresses in the rail and MW system, movements of the MW and the bridge, temperature. The behaviour of the steering bar and the bridge – track interaction is described and compared with the design and theoretical assumptions. The paper also gives the recommendations for the practical design and analysis of the MW system.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Procedia Engineering

  • ISBN

  • ISSN

    1877-7058

  • e-ISSN

  • Number of pages

    8

  • Pages from-to

    395-402

  • Publisher name

    Elsevier

  • Place of publication

    Cambridge

  • Event location

    Žilina

  • Event date

    Sep 30, 2016

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000383246700053