Implementation of BIM Technology into the design process using the scheme of BIM Execution Plan
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00326037" target="_blank" >RIV/68407700:21110/19:00326037 - isvavai.cz</a>
Result on the web
<a href="https://iopscience.iop.org/article/10.1088/1757-899X/471/2/022019" target="_blank" >https://iopscience.iop.org/article/10.1088/1757-899X/471/2/022019</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1757-899X/471/2/022019" target="_blank" >10.1088/1757-899X/471/2/022019</a>
Alternative languages
Result language
angličtina
Original language name
Implementation of BIM Technology into the design process using the scheme of BIM Execution Plan
Original language description
Digital Revolution is one of the most up-to-date topics in the construction industry – and not even in that. According to the spreading of a new trend in Building Design, Construction and Facility Management – using of Building Information Modelling Technology and its Management, there are going to be many changes in the way to develop the design process and other phases of building life cycle. BIM Technology use is present in the whole life cycle of buildings and other constructions and is able to connect all participants of building process in effective way. BIM Technology as a new trend in building design reveals the need to set up effective processes, their parts, participants, their responsibilities, goals and the way to reach goals, etc. The main philosophy of BIM Technology´s implementation into the design processes lies in the BIM Execution Plan. This Plan should be specified for specific activities in specific environment and for specific participants in the whole construction process. These processes should be well conceived and managed. That´s way we can undoubtedly replace the “M” in BIM (Modelling) by the “M” as a Management. This paper contributes to the further thoughtful strategy for the specific process of the design – from the designer´s point of view and implementation of BIM Technology into this process in order to make the design process more effective. There are identified possible barriers for this implementation, their main causes, proposal to remove these obstacles and outlined a possible process of effective design using BIM technology and its principles. It is important to realize, that the implementation of BIM Technology in the design process will lead to a better virtual reality of the building and thus its transformation into physical reality, will lead to a better construction and allow for greater cost savings not only during construction phase, but also in other phases of the building life cycle, especially during its use.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2019
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
IOP Conference Series: Materials Science and Engineering
ISBN
—
ISSN
1757-899X
e-ISSN
1757-899X
Number of pages
8
Pages from-to
—
Publisher name
IOP Publishing Ltd.
Place of publication
Bristol
Event location
Praha
Event date
Jun 18, 2018
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
000465811800019