All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

USING BUILDING INFORMATION MODELLING (BIM) IN CONSTRUCTION BUDGET: BENEFITS AND BARRIERS

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00332167" target="_blank" >RIV/68407700:21110/19:00332167 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.tf.llu.lv/conference/proceedings2019/Papers/N377.pdf" target="_blank" >http://www.tf.llu.lv/conference/proceedings2019/Papers/N377.pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.22616/ERDev2019.18.N377" target="_blank" >10.22616/ERDev2019.18.N377</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    USING BUILDING INFORMATION MODELLING (BIM) IN CONSTRUCTION BUDGET: BENEFITS AND BARRIERS

  • Original language description

    This article shows ways in which BIM data can be used to create construction budgets item by item. It describes conditions which need to be met in order to use BIM 5D model in its full value – i.e. this article deals primarily with documents used for creation of a BIM model, with their graphic and non-graphic specifications. The article shows a process based on keeping a close correspondence between construction budget items and BIM model elements. To make it clearer, let us state that there exists a classification system which matches each model element with an identifier, making it possible to link such element to a budget item or several items. In principle, the most important part is matching a construction element with an identifier, which can be “read” by pricing software. That makes the software able to transform construction elements into budget units. Case study shows an analysis of current situation using information models of two administrative buildings (currently under construction) and links these models to construction budgets. The transferred data made up for more than sixty per cent of construction budget, which means that four fifths of total budget could be predicted from automated calculations.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2019

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Engineering for Rural Development, Proceedings of 18th International Scientific Conference

  • ISBN

  • ISSN

    1691-5976

  • e-ISSN

    1691-5976

  • Number of pages

    8

  • Pages from-to

    1699-1706

  • Publisher name

    Latvia University of Agriculture

  • Place of publication

    Jelgava

  • Event location

    Jelgava

  • Event date

    May 22, 2019

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000482103500249