All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00313516" target="_blank" >RIV/68407700:21110/17:00313516 - isvavai.cz</a>

  • Result on the web

    <a href="http://iopscience.iop.org/article/10.1088/1757-899X/236/1/012110" target="_blank" >http://iopscience.iop.org/article/10.1088/1757-899X/236/1/012110</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1088/1757-899X/236/1/012110" target="_blank" >10.1088/1757-899X/236/1/012110</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

  • Original language description

    The article deals with problematic parts of automated processing of quantity takeoff (QTO) from data generated in BIM model. It focuses on models of road constructions, and uses volumes and dimensions of excavation work to create an estimate of construction costs. The article uses a case study and explorative methods to discuss possibilities and problems of data transfer from a model to a price system of construction production when such transfer is used for price estimates of construction works. Current QTOs and price tenders are made with 2D documents. This process is becoming obsolete because more modern tools can be used. The BIM phenomenon enables partial automation in processing volumes and dimensions of construction units and matching the data to units in a given price scheme. Therefore price of construction can be estimated and structured without lengthy and often imprecise manual calculations. The use of BIM for QTO is highly dependent on local market budgeting systems, therefore proper push/pull strategy is required. It also requires proper requirements specification, compatible pricing database and software.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Building up Efficient and Sustainable Transport Infrastructure 2017 (BESTInfra2017)

  • ISBN

  • ISSN

    1757-8981

  • e-ISSN

    1757-899X

  • Number of pages

    8

  • Pages from-to

  • Publisher name

    IOP Publishing Ltd

  • Place of publication

    Bristol

  • Event location

    Praha

  • Event date

    Sep 20, 2017

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000417428700110