All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

An automated nD model creation on BIM models

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F20%3A00341013" target="_blank" >RIV/68407700:21110/20:00341013 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.2478/otmcj-2020-0018" target="_blank" >https://doi.org/10.2478/otmcj-2020-0018</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.2478/otmcj-2020-0018" target="_blank" >10.2478/otmcj-2020-0018</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    An automated nD model creation on BIM models

  • Original language description

    The CONTEC(Construction technology) method was originally developed for automated construction technology planning and project management based on the data in the form of budget or bill of quantities. The paper outlines a new approach in automated creation of the discrete nD BIM models by utilization of data from BIM model and their processing by existing CONTEC (Construction Technology) method via CONTEC software. Paper outlines the discrete modeling approach on a BIM models as one of the applicable approaches for nD modeling. Defines the methodology of interlinking BIM model data and CONTEC software through the classification of items. Interlink enables automation in production of discrete nD BIM model data such as schedule (4D) including work distribution end resource planning, budget (5D) – based on integrated pricing system, but also nD data such, as health and safety risks(6D) plans (H&S Risk register), quality plans and quality assurance checklists(7D) including their monitoring and environmental plans(8D). Methodology of direct application of selected classification system is described as well as means of data transfer and conditions of data transferability. The method was tasted on the case study of office building project and acquired data were compared to actual construction time and costs. Case study proves application of the CONTEC method in the BIM model environment as usable method, enabling creation not only 4D, 5D models but as well nD discrete models up to 8D in the perception of construction management process. Further development of the method would be linking to the existing BIM classification systems thus enabling full automated discrete nD model creation in the BIM model environment.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>ost</sub> - Miscellaneous article in a specialist periodical

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2020

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Organization, Technology & Management in Construction

  • ISSN

    1847-5450

  • e-ISSN

  • Volume of the periodical

    2020

  • Issue of the periodical within the volume

    11

  • Country of publishing house

    HR - CROATIA

  • Number of pages

    14

  • Pages from-to

    2218-2231

  • UT code for WoS article

    000553377600001

  • EID of the result in the Scopus database