All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

A novel approach for managing change in warehouse processes via integration of business process re-engineering and interval-valued hesitant fuzzy DEMATEL

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F24%3A00381906" target="_blank" >RIV/68407700:21220/24:00381906 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.1108/BPMJ-07-2023-0567" target="_blank" >https://doi.org/10.1108/BPMJ-07-2023-0567</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1108/BPMJ-07-2023-0567" target="_blank" >10.1108/BPMJ-07-2023-0567</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    A novel approach for managing change in warehouse processes via integration of business process re-engineering and interval-valued hesitant fuzzy DEMATEL

  • Original language description

    PurposeThe main purpose of this study is to present a new approach to managing process changes in uncertain conditions. The proposed approach is applied in one of the largest production companies in Turkey to manage the changes in their warehouse processes which formed after the merger.Design/methodology/approachIn the model, interval-valued hesitant fuzzy the decision-making trial and evaluation laboratory (IVHF-DEMATEL) methodology is integrated into one of the most used BPR tools, change matrix. The main focus of the proposed model is to increase both flexibility and applicability in uncertain conditions. Thus, while the change matrix enables companies to be agile and responsive to changes, IVHF-DEMATEL provides a better way to continuously evaluate and determine critical processes, and strategies to align with evolving conditions.FindingsInitial analysis revealed two major problems, the slowness of shipments caused by the increase in costs and the confusion in the organizational structure. However, the conventional methods fall short of effectively determination of critical objectives in terms of dealing with uncertainty. Therefore, a comprehensive roadmap for managing the change is developed with the integration of IVHF-DEMATEL and change matrix so that a successful transition is achieved.Originality/valueIt is believed that the study will contribute to the existing literature by providing a novel approach in which the IVHF-DEMATEL methodology is integrated into the change matrix. Also, the study provides a guideline for practical applications by presenting a step-by-step implementation of the model.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    50204 - Business and management

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2024

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Business Process Management Journal

  • ISSN

    1463-7154

  • e-ISSN

    1758-4116

  • Volume of the periodical

    30

  • Issue of the periodical within the volume

    3

  • Country of publishing house

    GB - UNITED KINGDOM

  • Number of pages

    30

  • Pages from-to

    909-938

  • UT code for WoS article

    001216745300001

  • EID of the result in the Scopus database

    2-s2.0-85191816332