All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Profinet IO IRT Message Scheduling With Temporal Constraints

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F10%3A00169069" target="_blank" >RIV/68407700:21230/10:00169069 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Profinet IO IRT Message Scheduling With Temporal Constraints

  • Original language description

    An algorithm is presented that allows one to create a static schedule of the Profinet IO IRT communication, which is an industrial Ethernet protocol standardized in IEC 61158. This algorithm offers an alternative to the available commercial tool, providing comparable results with respect to the resulting schedule makespan. Furthermore, the problem is extended by useful temporal constraints providing a greater flexibility with respect to the individual messages. Due to this flexibility, it is possible toplace the selected messages in various parts of the communication cycle (in order to increase the computational time available for the main-controller application, or to retransmit the synchronization message without holdup in the switch, or to add newmessages into the original schedule). The solution is based on a formulation of the Profinet IO IRT scheduling problem in terms of the Resource Constrained Project Scheduling with Temporal Constraints.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    IN - Informatics

  • OECD FORD branch

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>Z - Vyzkumny zamer (s odkazem do CEZ)

Others

  • Publication year

    2010

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Industrial Informatics, IEEE Transactions on

  • ISSN

    1551-3203

  • e-ISSN

  • Volume of the periodical

    6

  • Issue of the periodical within the volume

    3

  • Country of publishing house

    US - UNITED STATES

  • Number of pages

    12

  • Pages from-to

  • UT code for WoS article

    000284008200012

  • EID of the result in the Scopus database