Risk Management Plan for Metro Station Safe Operation
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F16%3A00304113" target="_blank" >RIV/68407700:21260/16:00304113 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Risk Management Plan for Metro Station Safe Operation
Original language description
The metropolitan railway system like metro is very important structure of majority of capital traffic infrastructure. To ensure the safe metro operation, so its safety concept needs to have several layers. It goes minimally on: the construction of own entity and its equipment; ensuring the normal operation; and ensuring the operation at abnormal conditions. Due to both, the lack of knowledge, resources, forces and means, and the dynamic development of world, it needs to be in accordance with project management of the TQM type, processed plan of management of important risks, especially those that relate to: the human factor (errors in decision-making and management); the failures of nature technical, technological and cyber; a lack of sources, forces and resources.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
AQ - Safety and health protection, safety in operating machinery
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2016
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Risk, reliability and safety: innovating theory and practice
ISBN
978-1-138-02997-2
ISSN
—
e-ISSN
—
Number of pages
1
Pages from-to
209-209
Publisher name
CRC Press
Place of publication
London
Event location
Glasgow
Event date
Sep 25, 2016
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—