Monitoring of selected variables of the scaffold bridge over Masaryk Railway Station in Prague
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F10%3A00177137" target="_blank" >RIV/68407700:21610/10:00177137 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Monitoring of selected variables of the scaffold bridge over Masaryk Railway Station in Prague
Original language description
The railway viaduct over the Masaryk Railway Station is the largest bridge construction which was built within the construction called Nove spojeni. This construction is a connection of several railway stations in Prague connected by several bridges andtwo tunnels. The contractors of the whole contruction were Skanska ZS, SSŽ (Now EUROVIA CS a.s.), Metrostav and Subterra a.s, contractor of the bridge was SSŽ (Now EUROVIA CS a.s.). The designer of the bridge was SUDOP Prague, Ing. Sterba and Ing. Safar.The measurement of the construction was decided after meticulous due to the complex nature of the construction. The aim of the article is to describe the current state of monitoring and to show the final results.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JM - Structural engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2010
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
CCC 2010 Proceedings - Concrete Strucrures for Challenging Times
ISBN
978-80-87158-26-5
ISSN
—
e-ISSN
—
Number of pages
7
Pages from-to
—
Publisher name
Česká betonářská společnost ČSSI
Place of publication
Praha
Event location
Marianské Lázně
Event date
Sep 30, 2010
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—