All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

1 878 (0,06s)

Result

The complying of tasks of the engineering securing of the battle by unions of the arms

The complying of tasks of the engineering securing of the battle by unions of the arms...

KA - Vojenství

  • 1997
  • Jx
Result

Currency principles for the missile launcher baterry byr complying tasks in the waiting positions

Currency principles for the missile launcher baterry byr complying tasks in the waiting positions...

KA - Vojenství

  • 1998
  • Jx
Result

Headlamp prototype with LD and complying with ECE White standards

Headlight focussing the white light and complying ECE White standards, generated by blue LEDs and partially converted plate monocrystalline phosphors....

JA - Elektronika a optoelektronika, elektrotechnika

  • 2015
  • Gfunk
Result

Upgrade of wheeled and tracked vehicles to higher blast protection according to STANAG 4569 (level M1, M2)

The result consists of three samples of blast resistant armour they comply armour of the type PO3-A, which comply with level M1 requirements for structural for a military truck. The cabin comply with level M1 requirements f...

Materials engineering

  • 2019
  • Gfunk
Result

Influence of Technological Procedures on Mechanical Properties of Bonded Joint

of failure to comply with technological procedures in the realization of facade cladding the implementation of a project that there are failures to comply with multiple requirements of failure to comply with technological ...

Civil engineering

  • 2018
  • JSC
  • Link
Result

Public contract (possibility of contracting authority to negotiate offers that do not comply with the mandatory requirements of the technical specifications listed in the tender documents relating

Article 30(2) of Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts does not allow the co...

AG - Právní vědy

  • 2014
  • Jx
Result

Competition of Crop Management Practices Kroměříž 2019: Quality of harvested wheat grain in comparison with the harvest results of the Czech Republic

density, for which 87% of the variations complied. All variants complied of the Competition complied with the requirements of the ČSN for bakery wheat. In spite, 60% of 553 analyzed samples complied with ČSN requi...

Agronomy, plant breeding and plant protection; (Agricultural biotechnology to be 4.4)

  • 2020
  • Jost
  • Link
Result

On the Consequences of Failure to Comply with the Time Limit under Section 1977 of the Czech Civil Code

This paper deals with a comprehensive analysis of the consequences of failure to comply with the time limit under section 1977 of the Czech Civil Code (CC). The author thoroughly criticizes the views of Czech doctrine and the recent judicial...

Law

  • 2023
  • Jost
  • Link
Result

Safety Study for not Complying with Regulations

This article deals with the possibilities of failure to comply with compliance-basedregulation thanks to creation a safety study for intended proceses. These are very importantopportunities in aviation where currently safety studies attach a...

JU - Aeronautika, aerodynamika, letadla

  • 2015
  • D
  • Link
Result

Add-on armour PPK1-F

Add-on armour consist of ceramic panel and base steel armour of total thickness 30.5 mm and areal weight 110kg/m2. Fully complies with Level 3 according to STANAG 4569 and defeat projectile 7,62 x 51 AP8 (WC) and projectile 7,62x54R B32 API....

JI - Kompositní materiály

  • 2010
  • Gfunk
  • 1 - 10 out of 1 878