Near zero emission advanced fluidised bed gasification
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
3094/2010-32
Alternative language
Project name in Czech
Near zero emission advanced fluidised bed gasification
Annotation in Czech
The developments of fluidised bed gasification technologies stopped at pilot/demonstration scale for economic reasons but it grow the interest in its use with biomass for many reasons fuel flexibility, wide range operation scales suitability, etc.) In this project the way to overcoming the potential disadvantages of fluidised bed gasification and its use to process biomass/waste together with coal and the technology for CO2 capture/reduction will be investigated. The effects of different fuels, composition and gasification medium on the quality of the producer gas will be also evaluated.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JE - Non-nuclear power engineering, energy consumption and utilization
CEP - secondary branch
CI - Industrial chemistry and chemical engineering
CEP - another secondary branch
DI - Pollution and air control
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10511 - Environmental sciences (social aspects to be 5.7)<br>20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>20704 - Energy and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Jul 31, 2010
Project status
U - Finished project
Latest support payment
Apr 27, 2010
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP11-MSM-7C-U/01:1
Data delivery date
Jun 30, 2011
Finance
Total approved costs
1,924 thou. CZK
Public financial support
1,924 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK