Development of a rapid configuration system for textile production machinery based on the physical behaviour simulation of precision textile structures
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP7-NMP-2007-SMALL-1
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1086/2011-321
Alternative language
Project name in Czech
Development of a rapid configuration system for textile production machinery based on the physical behaviour simulation of precision textile structures
Annotation in Czech
To overcome functionality limits of the currently available textile design systems, the objective of this project is to develop a simulation system for the physical-mechanical properties of the textile structures, that enables the rapid manufacturing process configuration.The system will support the product development and production for all products in textile value-added chain (yarns, woven fabrics, knitware and needle-punch non-wovens). This virtual construction system will allow the performance prediction of multifunctional textiles before the starting to manufacture.
Scientific branches
R&D category
VV - Exeperimental development
CEP classification - main branch
JP - Industrial processes and processing
CEP - secondary branch
JS - Reliability and quality management, industrial testing
CEP - another secondary branch
JB - Sensors, detecting elements, measurement and regulation
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20201 - Electrical and electronic engineering<br>20306 - Audio engineering, reliability analysis<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Nov 1, 2009
Realization period - end
Apr 30, 2012
Project status
U - Finished project
Latest support payment
Mar 19, 2012
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP13-MSM-7E-U/01:1
Data delivery date
Jun 28, 2013
Finance
Total approved costs
1,531 thou. CZK
Public financial support
1,531 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK