All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7E09022

Development of a rapid configuration system for textile production machinery based on the physical behaviour simulation of precision textile structures

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP7-NMP-2007-SMALL-1

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    1086/2011-321

Alternative language

  • Project name in Czech

    Development of a rapid configuration system for textile production machinery based on the physical behaviour simulation of precision textile structures

  • Annotation in Czech

    To overcome functionality limits of the currently available textile design systems, the objective of this project is to develop a simulation system for the physical-mechanical properties of the textile structures, that enables the rapid manufacturing process configuration.The system will support the product development and production for all products in textile value-added chain (yarns, woven fabrics, knitware and needle-punch non-wovens). This virtual construction system will allow the performance prediction of multifunctional textiles before the starting to manufacture.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20306 - Audio engineering, reliability analysis<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Nov 1, 2009

  • Realization period - end

    Apr 30, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Mar 19, 2012

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP13-MSM-7E-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    1,531 thou. CZK

  • Public financial support

    1,531 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK