All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
8B20011

Measurement methods and test procedures for assesing accuracy of instruments transformers for power quality measurements

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    Český metrologický institut

  • Contest type

    M2 - International cooperation

  • Contract ID

    8B20011

Alternative language

  • Project name in Czech

    Measurement methods and test procedures for assesing accuracy of instruments transformers for power quality measurements

  • Annotation in Czech

    The overall goal of the project is the development of the metrological framework to enable the traceable calibration of ITs to be employed for PQ measurements in electricity grids, which can be used by IEC TC 38 Instrument transformers as a basis for the future standardisation about the use of ITs for PQ from IEC TC 38. The specific objectives of the project are: 1. To define accuracy and uncertainty limits of ITs in PQ measurements, by proposing and experimentally verifying specific performance indices for the single PQ parameters and by defining a new “PQ Accuracy Class” for ITs, which would be the extension of the concept of classical “accuracy class”. 2. To establish suitable reference measuring systems for ITs and methods for the evaluation of the relevant uncertainty contribution of ITs to PQ indices.

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    10700 - Other natural sciences

  • OECD FORD - secondary branch

    10700 - Other natural sciences

  • OECD FORD - another secondary branch

    10700 - Other natural sciences

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by the international provider in accordance with the rules of the program the Ministry of Education, Youth and Sports does not realize the evaluation of project.

Solution timeline

  • Realization period - beginning

    Aug 1, 2020

  • Realization period - end

    Jul 31, 2023

  • Project status

    U - Finished project

  • Latest support payment

    Feb 17, 2023

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP24-MSM-8B-U

  • Data delivery date

    Jul 1, 2024

Finance

  • Total approved costs

    1,560 thou. CZK

  • Public financial support

    1,560 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK